Service hotline 

18914633898

通用banner
Your current location: Home >> News >> Industry trends

ContactContact Us

Jiangsu Xiongyue petroleum machinery equipment

contacts:Qiu Chen

Telephone:18914633551   

Mailbox:scott@jxpgroup.com.cn

contacts:Gu Zhengmiao 

Telephone:18914633898   

Mailbox:XY@jxpgroup.com.cn

contacts:Yan Hongmei

Telephone:18914633968   

Mailbox:Anne@jxpgroup.com.cn

Landline:0515-84109966

Address: PrivateVenture Park of          Dongkan Town, Binhai County                Yancheng City,  Jiangsu Province            People's Republic of China

Website:www.jxpcompany.com

Replacement and repair of high pressure Union

2020-09-02 H:30:15
second

Replacement and repair of high pressure Union

① It includes the contents of medium repair.

② Clean all gears, bearings and shafts of reducer, lead screw, nut, bevel gear, worm gear and worm of distance adjusting equipment, and bearings of other parts, and replace or correct them.

③ Replace or repair the high-pressure Union, jack up the plunger and cylinder liner of the cylinder and align it from the beginning.

④ Replace or repair the severely worn working mix, supporting shaft, connecting rod, lever and supporting rod of conveying equipment.

⑤ Replace or repair the friction plate of pneumatic friction clutch.

⑥ Replace universal coupling.

⑦ High pressure union is painted from scratch.

(3) Maintenance method and quality standard of high pressure Union.

① The pin shaft at the joint part, bearing with severe wear, bushing, seal, damaged appearance and electrical components shall be replaced.

② The working silver, supporting shaft and transmission shaft with less bending deformation can be straightened, and the service life of straightness after repair is less than or equal to. 06 mm / M and + 0. 06 mm / m respectively.

③ The two ends of the Bush and shaft of the sliding bearing with light wear can be repaired by grinding, and the contact point of the stressed surface shall not be less than 45%.

④ The valve core with light wear can be repaired by grinding, with no leakage as the criterion. Wear severe to replace.

⑤ The engagement between the adjustable lead screw and the nut should be normal. The axial clearance should meet the requirements. The thickness wear of lead screw and nut should not exceed 1 / 5, otherwise it should be replaced.

⑥ Gear and worm gear shall be repaired according to failure mode. However, the wear of the tooth surface should not exceed 1 / 5 of the tooth thickness, otherwise it should be replaced.

(4) The high pressure after maintenance shall be inspected by.

① After minor repair and medium repair of the machine, part of the repair parts are tested and the whole vehicle runs for iomin without load, and the machine is delivered for use after normal operation.

② After the high-pressure union is overhauled, the test run is carried out according to the test run request after the installation of the new machine. The inspection procedures can be processed after the judgment that it meets the quality standard and meets the technical requirements.

③ The maintenance records and fault records shall be filed.

Label

Next:Is elbow flange a pipe fitting?2020-09-02 09:40:45

Recent:

Related products

Contact us

contacts:Qiu Chen  

Telephone:18914633551   

Mailbox:scott@jxpgroup.com.cn

contacts:Gu Zhengmiao 

Telephone:18914633898   

Mailbox:XY@jxpgroup.com.cn

contacts:Yan Hongmei

Telephone:18914633968   

Mailbox:Anne@jxpgroup.com.cn

Landline:0515-84109966

Address: Private Venture Park of Dongkan Town Binhai County

 Yancheng City, Jiangsu Province People's Republic of China


official account

Mobile website

Copyright © Jiangsu Xiongyue petroleum machinery equipment All rights reserved Record No Su ICP Bei no.2020054717

13.png